Laterite Stone masnory
(9" Thick) Laterite Stone masnory 1:6 (quntty for 100cft)
items Qntty/cft/kg rate amount unit
Laterite Stone 180.00 15.00 2700.00 cft
Sand 18.05 10.00 180.51 cft
Cement 3.01 251.00 755.15
3635.67 100/cft
36.36
Add Labour ( including curing) 19.00
55.36
Add contractor profit 10.00 % 5.54
Rate: 60.89 /cft
Material Calculations Part
Material analysis for 100 cft (9” wall) laterite work – Ratio: 1:6
Size of laterite without mortar= 1'3"x0'9"x0'6"= 0.47cft
No of laterite for 100 cft works = 170 nos+ Add 10 no As Wasteges=180 nos
Total Volume of Laterite For 100Cft= 79.9 cft
Volume of mortar =( 100.65 - 79.9) = 20.75 cft Add 1.5% Wastage
Dry Volume = 20.75X 1.5 = 21.06 cft
Ratio - 1:6 (Cement: Sand) = Sum of ratio = 7
Cement = (21.06*1)/7= 3.00 cft
Sand =(21.06*6)/7= 18.05 cft
Labour Calculations Part
Mason 350 /Head
Helper 250 /Head
labour rate Analysis : Quantity Labour Amount
35.00 600.00 17.14
18.00/Cft
1mason+1Helper Can Do 35.25Cft Work/75no laterite Work
1mason+2Helper Can Do 46.00Cft Work/100no laterite Work
(9" Thick) Laterite Stone masnory 1:6 (quntty for 100cft)
items Qntty/cft/kg rate amount unit
Laterite Stone 180.00 15.00 2700.00 cft
Sand 18.05 10.00 180.51 cft
Cement 3.01 251.00 755.15
3635.67 100/cft
36.36
Add Labour ( including curing) 19.00
55.36
Add contractor profit 10.00 % 5.54
Rate: 60.89 /cft
Material Calculations Part
Material analysis for 100 cft (9” wall) laterite work – Ratio: 1:6
Size of laterite without mortar= 1'3"x0'9"x0'6"= 0.47cft
No of laterite for 100 cft works = 170 nos+ Add 10 no As Wasteges=180 nos
Total Volume of Laterite For 100Cft= 79.9 cft
Volume of mortar =( 100.65 - 79.9) = 20.75 cft Add 1.5% Wastage
Dry Volume = 20.75X 1.5 = 21.06 cft
Ratio - 1:6 (Cement: Sand) = Sum of ratio = 7
Cement = (21.06*1)/7= 3.00 cft
Sand =(21.06*6)/7= 18.05 cft
Labour Calculations Part
Mason 350 /Head
Helper 250 /Head
labour rate Analysis : Quantity Labour Amount
35.00 600.00 17.14
18.00/Cft
1mason+1Helper Can Do 35.25Cft Work/75no laterite Work
1mason+2Helper Can Do 46.00Cft Work/100no laterite Work